Projects: Projects for Investigator |
||
Reference Number | NIA_NGN_291 | |
Title | Large Diameter PE Pipe Cutter | |
Status | Completed | |
Energy Categories | Fossil Fuels: Oil Gas and Coal(Oil and Gas, Refining, transport and storage of oil and gas) 100%; | |
Research Types | Applied Research and Development 100% | |
Science and Technology Fields | ENGINEERING AND TECHNOLOGY (Mechanical, Aeronautical and Manufacturing Engineering) 100% | |
UKERC Cross Cutting Characterisation | Not Cross-cutting 100% | |
Principal Investigator |
Project Contact No email address given Northern Gas Networks |
|
Award Type | Network Innovation Allowance | |
Funding Source | Ofgem | |
Start Date | 01 March 2021 | |
End Date | 01 March 2022 | |
Duration | ENA months | |
Total Grant Value | £168,650 | |
Industrial Sectors | Energy | |
Region | Yorkshire & Humberside | |
Programme | Network Innovation Allowance | |
Investigators | Principal Investigator | Project Contact , Northern Gas Networks (100.000%) |
Industrial Collaborator | Project Contact , Northern Gas Networks (0.000%) |
|
Web Site | https://smarter.energynetworks.org/projects/NIA_NGN_291 |
|
Objectives | Discovery – Initial stakeholder sessions have already taken place within Northern Gas Networks to develop scope and objectives for this project.Design and Development – Steve Vick International will undertake this stage at their facilities in Bradford on Avon. SVI will detail all work carried out with all key milestones / decisions made in the form a log / report. This report is to be shared with NGN prior to advancing to the next phase.Field trials – To be carried out under a G23 mandate to make sure the cutter is suitable to be used on the network. Measurement of efficiency, safety and usage will be monitored and recorded.Project Closure – End of project phase to assess whether the cutter is viable to be produced to be used commercially. All design and development work from TRL 4 up to TRL 7. (NIA Funded) Data collection to allow project progression to TRL 8 and 9 (SVI Funded) A finished cutting system at TRL 8 with all additional design and refactoring work (SVI Funded) and therefor outside of NIA funded activities and will be provided at SVIs expense. A cutting system that can be used in and out of an excavation by a single operator. The objective of the project is to deliver: Identify the best two methods for LDPE cutting Identify the best single method for cutting LDPE Produce the final prototype machine for use on Northern Gas Netwoks sites Supply a factory ready machine to NGN (BAU or TRL 8-9) | |
Abstract | The proposed project is to work in partnership with Steve Vicks International to design, develop and demonstrate a safe and practical method to enable safe, efficient and reliable cutting of large diameter PE pipe with wall thickness up to 103mm, inclusive of 630mm diameter pipes.We propose that the cutting machine designed will operate in both below ground and above groundscenarios.Design, manufacturing and testing will be carried out at the SVI headquarters in Bradford on Avon and a Technical Report will be completed and supplied to NGN for evaluation prior to moving into any subsequent project phases.The finished design will be assessed by a 3rd party to ensure compliance with any relevant legislation that may affect the design and use of the cutter once completed. | |
Publications | (none) |
|
Final Report | (none) |
|
Added to Database | 19/10/22 |